Side view of the Placas do Brasil plant at dusk, with the main building bearing the company name and the process towers and the stack in the background

Project · MDF

Placas do Brasil MDF: a 35,000 m³/month MDF plant, from greenfield site to start-up

FIG 01 Side view of the plant · Placas do Brasil, Espírito Santo, Brazil

MDF plant built from greenfield site to start-up in Espírito Santo, Brazil, with a capacity of 35,000 m³/month, a 38 m continuous press and 173,000 m² of built area. ProHolz developed the conceptual, basic and detailed engineering and managed the project.

ProHolz engineered and managed the project; procurement and construction remained with the client.

ProHolz covered two areas, from greenfield site to start-up

  1. 01

    Conceptual, basic and detailed engineering

  2. 02

    Project management, from greenfield site to start-up

The completed plant, seen from above

  • Aerial view of the Placas do Brasil plant, with the light-colored roof of the main building in the foreground and the process towers and the stack in the background
    FIG 02 Aerial view of the plant · Placas do Brasil, Espírito Santo, Brazil
  • Aerial view of the Placas do Brasil plant at dusk, with the roof of the main building in the foreground and the process towers in the background
    FIG 03 Aerial view of the plant at dusk · Placas do Brasil, Espírito Santo, Brazil

Other projects

Other MDF projects

Panoramic view of the Guararapes MDF 3 construction site, with towers, silos and the main building under construction MDF

Santa Catarina, Brazil · 2019 to 2023

Guararapes MDF 3

MDF line with a 48 m continuous press. Business plan, conceptual, basic and detailed engineering, and project management through start-up.

Capacity
500,000 m³/year
Continuous press
48 m
Approx. investment
BRL 850 million
3D model of the press and foundations of Sudati MDF 2 MDF3D model

Santa Catarina, Brazil · since 2023

Sudati MDF 2

MDF line with a 38 m continuous press. Conceptual, basic and detailed engineering in a single BIM model covering layout, press, dryer, evaporator and dust extraction.

Capacity
400,000 m³/year
Continuous press
38 m
Approx. investment
BRL 800 million

Investment values are approximate, for order of magnitude only.

See all projects

Contact

Have a similar plant in mind? Tell us what needs to be engineered

A technical conversation defines the scope, the disciplines and the engagement model: EPCM, owner's engineering or value engineering.