MDF
Guararapes MDF 3
MDF line with a 48 m continuous press. Business plan, conceptual, basic and detailed engineering, and project management through start-up.
- Capacity
- 500,000 m³/year
- Continuous press
- 48 m
- Approx. investment
- BRL 850 million
Projects
Industrial plants with ProHolz engineering, completed or in progress. In several of them, ProHolz also managed the project through start-up.
FIG 01 Aerial view of the plant · Placas do Brasil, Espírito Santo, Brazil
By sector
Three MDF lines in Brazil, an OSB plant in Argentina and the expansion of an OSB plant in Chile.
MDF
MDF line with a 48 m continuous press. Business plan, conceptual, basic and detailed engineering, and project management through start-up.
MDF3D model
MDF line with a 38 m continuous press. Conceptual, basic and detailed engineering in a single BIM model covering layout, press, dryer, evaporator and dust extraction.
MDF
MDF plant built from greenfield site to start-up, with a capacity of 35,000 m³/month and 173,000 m² of built area.
OSB3D model
OSB plant implemented in two phases, with re-engineering and tropicalization of a refurbished Dieffenbacher multi-opening press.
OSB
Expansion of an operating OSB plant, with new areas tied into the existing line. Basic and detailed engineering, more than 500 isometric sheets and inspection of the installation work.
Pellet plants in Brazil and Chile, both with cogeneration.
Pellets
One of the largest pellet plants in Chile, with a biomass boiler. Integration of the suppliers' designs, electrical engineering, piping and start-up support.
Pellets3D model
Greenfield pellet plant with 5 MW cogeneration that burns biomass and reuses the steam in the process. Conceptual, basic and detailed engineering.
A new paper cup plant in Ponta Grossa (PR), Brazil.
Packaging3D model
New greenfield paper cup plant. Conceptual and basic engineering, utilities and architectural design, and project management.
Sanitary processing with stainless steel piping.
Beverages
Detailed engineering of the product, CIP cleaning and utility piping for the syrup preparation room, with the pipe supports and cable trays, in a 3D model.
A log chipping line for a biomass power plant in Argentina. Cogeneration is also part of the pellet projects: a 2 MW ORC turbine at Chilepanel, in Chile, and 5 MW from biomass at LatAm Forest, in Rio Grande (RS), Brazil.
Energy3D model
New log chipping line integrated into an operating biomass power plant. Basic and detailed engineering, with three manufacturers and the existing plant in the same 3D model.
Investment figures are approximate and given only as an order of magnitude.
Contact
A technical conversation defines the scope, the disciplines and the engagement model: EPCM, owner's engineering or value engineering.