3D model of the interior of the LatAm Forest pellet plant building, with process equipment, steel platforms and colored piping

Project · Pellets

LatAm Forest: greenfield pellet plant in Rio Grande, Brazil, with 5 MW biomass cogeneration

FIG 01 3D model: building interior · LatAm Forest, Rio Grande (RS), Brazil

A greenfield pellet plant in Rio Grande (RS), Brazil, with 5 MW cogeneration that burns biomass and reuses the steam in the process. ProHolz developed the conceptual, basic and detailed engineering.

ProHolz engineered the project; procurement and construction remained with the client.

The 5 MW cogeneration was integrated into the pellet process

  1. 01

    Conceptual, basic and detailed engineering

  2. 02

    5 MW cogeneration

    Biomass firing, with the steam reused in the process.

  3. 03

    Integration of the engineering work

    The local engineering was integrated with that of the foreign suppliers.

The project as a 3D model

  • 3D model of a large piece of equipment with an access platform, topped by ducts and silos, inside the LatAm Forest building
    FIG 02 3D model: process equipment in the building · LatAm Forest, Rio Grande (RS), Brazil
  • 3D model of the overall site layout of the LatAm Forest plant, with the production building, the administration building, the gatehouse and the parking area
    FIG 03 3D model: overall site layout · LatAm Forest, Rio Grande (RS), Brazil
  • Aerial view of the 3D model of the LatAm Forest building, with the steel roof structure, a tall building with platforms and a stack
    FIG 04 3D model: aerial view of the building and the process area · LatAm Forest, Rio Grande (RS), Brazil

Other projects

Other projects

Thermal oil boiler in the final stage of erection, with steel structure and orange guardrails, on a construction site in Chile Pellets

Chile · since 2024 · in start-up

Chilepanel Pellets

One of the largest pellet plants in Chile, with a biomass boiler. Integration of the suppliers' designs, electrical engineering, piping and start-up support.

Capacity
120,000 t/year
Cogeneration
ORC, 2 MW
Approx. investment
USD 50 million
3D model of the BO Packaging plant, with the yellow-fronted building and the company logo, the administration block, the gatehouse, the parking lot and trucks at the entrance Packaging3D model

Ponta Grossa (PR), Brazil · 2018 · greenfield

BO Packaging

New greenfield paper cup plant. Conceptual and basic engineering, utilities and architectural design, and project management.

Type
Greenfield
Period
2018
Approx. investment
USD 15 million

Investment values are approximate, for order of magnitude only.

See all projects

Contact

Have a similar plant in mind? Tell us what needs to be engineered

A technical conversation defines the scope, the disciplines and the engagement model: EPCM, owner's engineering or value engineering.