Three stainless steel tanks with agitators, overhead sanitary piping and wire mesh cable trays above, inside the plant building

Project · Beverages

Syrup room of a beverage plant in Paraná, Brazil: 71 lines detailed in the 3D model and already installed

FIG 01 Tanks with agitators under the stainless steel lines and the cable trays · Paraná, Brazil

ProHolz detailed the piping of the syrup preparation room, its pipe supports and the cable trays. The model also includes the tanks, the pumps and the building, and more than 100 isometric drawings were produced from it.

ProHolz engineered the project; procurement and installation remained with the client.

Detailed engineering ran from the pipe specification to the bills of materials

  1. 01

    304L stainless steel in 60 lines

    Mostly sanitary tubing to ASTM A270, mechanically polished. Sizes from 3/4" to 5"; the other 11 lines are carbon steel.

  2. 02

    15 process and utility services

    Including simple and compounded syrup, CIP cleaning with acid and caustic, chlorinated and dechlorinated potable water, steam, condensate, compressed air and cooling tower water.

  3. 03

    Pipe support books

    Primary and secondary supports, plus 2 special supports.

  4. 04

    Line, valve and instrument lists and bills of materials

    Issued together with the piping and cable tray isometrics in 6 packages, from September 2025 to January 2026.

The syrup tank area, in the model and on site

3D model with four syrup tanks under a walkway and three tanks on the left, connected by piping color-coded by service and resting on blue supports
FIG 02 3D model, with the lines color-coded by service · Paraná, Brazil
The same area as installed: stainless steel tank with agitator and piping in the foreground, and four syrup tanks under a walkway in the background
FIG 03 The same area on site · Paraná, Brazil

The syrup room seen from above

  • 3D model of the syrup preparation room, with two mixing tanks, a larger tank with an access ladder, and piping color-coded by service on blue supports
    FIG 04 3D model: mixing tanks, access ladder and lines on supports · Paraná, Brazil

Other projects

Other projects

3D model of the BO Packaging plant, with the yellow-fronted building and the company logo, the administration block, the gatehouse, the parking lot and trucks at the entrance Packaging3D model

Ponta Grossa (PR), Brazil · 2018 · greenfield

BO Packaging

New greenfield paper cup plant. Conceptual and basic engineering, utilities and architectural design, and project management.

Type
Greenfield
Period
2018
Approx. investment
USD 15 million
Thermal oil boiler in the final stage of erection, with steel structure and orange guardrails, on a construction site in Chile Pellets

Chile · since 2024 · in start-up

Chilepanel Pellets

One of the largest pellet plants in Chile, with a biomass boiler. Integration of the suppliers' designs, electrical engineering, piping and start-up support.

Capacity
120,000 t/year
Cogeneration
ORC, 2 MW
Approx. investment
USD 50 million

Investment values are approximate, for order of magnitude only.

See all projects

Contact

Have a sanitary process room to detail? Tell us what needs to be engineered

A technical conversation defines the scope, the disciplines and the engagement model: EPCM, owner's engineering or value engineering.