Packaging3D model
BO Packaging
New greenfield paper cup plant. Conceptual and basic engineering, utilities and architectural design, and project management.
- Type
- Greenfield
- Period
- 2018
- Approx. investment
- USD 15 million
Project · Beverages
FIG 01 Tanks with agitators under the stainless steel lines and the cable trays · Paraná, Brazil
ProHolz detailed the piping of the syrup preparation room, its pipe supports and the cable trays. The model also includes the tanks, the pumps and the building, and more than 100 isometric drawings were produced from it.
ProHolz engineered the project; procurement and installation remained with the client.
Mostly sanitary tubing to ASTM A270, mechanically polished. Sizes from 3/4" to 5"; the other 11 lines are carbon steel.
Including simple and compounded syrup, CIP cleaning with acid and caustic, chlorinated and dechlorinated potable water, steam, condensate, compressed air and cooling tower water.
Primary and secondary supports, plus 2 special supports.
Issued together with the piping and cable tray isometrics in 6 packages, from September 2025 to January 2026.


Other projects
Packaging3D model
New greenfield paper cup plant. Conceptual and basic engineering, utilities and architectural design, and project management.
Pellets
One of the largest pellet plants in Chile, with a biomass boiler. Integration of the suppliers' designs, electrical engineering, piping and start-up support.
Investment values are approximate, for order of magnitude only.
Contact
A technical conversation defines the scope, the disciplines and the engagement model: EPCM, owner's engineering or value engineering.